Bioengineering Case Studies

Bioengineering Case Studies
-0 %
Sustainable Stream Bank and Slope Stabilization
 HC runder Rücken kaschiert
Print on Demand | Lieferzeit: Print on Demand - Lieferbar innerhalb von 3-5 Werktagen I

Unser bisheriger Preis:ORGPRICE: 106,99 €

Jetzt 106,98 €* HC runder Rücken kaschiert

Alle Preise inkl. MwSt. | Versandkostenfrei
Artikel-Nr:
9781461479956
Veröffentl:
2013
Einband:
HC runder Rücken kaschiert
Erscheinungsdatum:
26.11.2013
Seiten:
264
Autor:
Wendi Goldsmith
Gewicht:
905 g
Format:
285x215x20 mm
Sprache:
Englisch
Beschreibung:

Donald Gray is Professor Emeritus in the Department of Civil and Environmental Engineering, University of Michigan;
John McCullah is President, Salix Applied Earthcare, Redding, CA; and Wendi Goldsmith is CEO, Bioengineering Group, Salem, MA.
"Bio-Stabilization Case Studies: Treatment and Performance Evaluation" describes and evaluates 30 projects from across the United States where bio-stabilization was employed to address a detrimental naturally occurring process or byproduct of the built environment. Bio-stabilization (or soil bioengineering) refers to the use of plant materials, primarily live cuttings, arranged in the ground in different arrays to reinforce soils and protect upland slopes and/or stream banks against surficial erosion and shallow slope failures. Examples included in the collection represent different regions of the country and their specific conditions and challenges. Each project is illustrated with a number of distinctive photographs to support the reader's understanding and showcase the wide scope of projects and techniques presented. The volume is ideal for civil and environmental engineers and environmental scientists working on watershed, infrastructure projects, and municipal scale installations.
This book describes and evaluates 30 projects from across the United States where bio-stabilization was used to address a detrimental naturally occurring process or byproduct of the built environment. Each project is illustrated with distinctive photographs.
Presents for the first time a range of well-documented case studies on key techniques and best practices for bio-stabilization projects
Introduction.- Project 1: Fleming Creek.- Project 2: Gateway Garden.- Project 3: School Girls Glen.- Project 4: River Landing.- Project 5: Nichols Drive.- Project 6: Harvard Road.- Project 7: Malletts Creek.- Project 8: Toboggan Hill.- Project 9: Argo Cascades.- Project 10: Asaayi Lake.- Project 11: Hollywood Hills.- Project 12: Geyserville.- Project 13: Buckhorn Mtn.- Project 14: Buckhorn Summit.- Project 15: Stafford.- Project 16: Pacifica.- Project 17: Branciforte Creek.- Project 18: San Vicente Creek.- Project 19: Opal Cliffs.- Project 20: Lower Sulpur Creek.- Project 21: Secret Canyon.- Project 22: Greenfield Road.- Project 23: Buffalo Bayou.- Project 24: Little_Topashaw.- Project 25: New Concord.- Project 26: Water Purification Facility and Park.- Project 27: Walden Pond.- Project 28: Hearthstone Quarry Brook.- Project 29: Mill Creek.- Project 30: Chalres River.- Project 31: Connecticut River.- Project 32: Cumberland River.- Project 33: Manhan River.- Project 34: Walgreen Slope.- Project 35: Creek Road.- Appendices A-C.

Kunden Rezensionen

Zu diesem Artikel ist noch keine Rezension vorhanden.
Helfen sie anderen Besuchern und verfassen Sie selbst eine Rezension.